Skip to content ↓

The Generator House

Published on 22/10/18

The Generator House (formally the Workshop) will be ready for use by the end of the Autumn Term 2018. The Generator House is a heritage building and is being sympathetically restored throughout. The glazed brickwork has been cleaned and the original windows have been carefully reinstated including the previously 'lost' circular window above the doorway. New lighting, insulation and flooring have also been fitted. The Generator House will store large technology department equipment such as lathes and will be newly furnished once complete. 

blog_post_1344